FerraPod®
Flexible Grid System Certified Resistance Class 4 according to SS EN 1627-30 and approved SSF 012 Class 4

















Flexible Perimeter protection in Protection Class 3
FerraPod® is a Swedish-made modular grid system that adapts to every environment — it can be installed around, over or through existing infrastructure without affecting operation or airflows. The system is certified according to SS-EN 1627 RC 4, which corresponds to Swedish protection class 3. Installation is carried out completely without hot works and the structure can be easily adjusted, dismantled or rebuilt according to the needs of the business.




Reliable Security Solutions
in Sensitive Environments
The FerraPod grid system provides a robust perimeter protection around an organization’s most critical functions. Common applications include security solutions for backup power, cooling systems, and other critical infrastructure.
The product has been developed in collaboration with customers who have extremely high security requirements, both regarding burglary protection and operational reliability. Therefore, we have adapted the product for installation even in the most sensitive environments, such as data centers, where airflow and dust particles greatly impact operations.
Openings
We can create openings and enclosures anywhere, for example for ventilation ducts and cable trays.
Doors & Gates
We install the door or gate of your choice, tailored to your requirements and preferences.
We are happy to talk about certified protection!
Book an appointment or call and ask about certified and flexible perimeter protection. Or ask us for a quote completely according to your requirements and wishes!

Tel No: +46 70-421 69 46
E-mail: Karolina@ferrapod.se

Tel No: +46 70-829 95 95
E-mail: Jarmo@ferrapod.se

Tel No: +46 70-897 00 61
E-mail: Gustaf@ferrapod.se
Suppliers & Architects
By integrating FerraPod into their offering, suppliers can meet the needs of clients with high security requirements. It’s a unique added value that strengthens both bids and business in procurements and projects with Resistance Class 4 requirements.
When architects and project managers include FerraPod in their drawings and projects, they get a reliable solution that meets all requirements for Protection Class 3. This simplifies the process of ensuring physical security already in the planning phase — and strengthens the overall project in procurement and execution.
Legal requirements
The NIS-1 and NIS-2 directives impose increased requirements for physical and digital security on critical infrastructure operations within the EU.
FerraPod®
Helps businesses meet requirements by protecting against intrusion, sabotage, and disruption.


Market-Leading Security
We are the only provider on the market able to deliver certified, fully completed solutions that meet all the requirements to be classified as Protection Class 3 according to current guidelines. This means our customers receive approved perimeter protection right upon delivery—without compromises, extra efforts, or uncertainties. A secure, time-saving, and quality-assured choice for operations with high security demands.
SS ONE 1627-30 RC 4
Total test duration: 30 minutes, of which 10 minutes are effective attack time. The intruder is prepared to take greater risks and invest more time.
SSF 012 Class 4
The highest burglary protection class for roller shutters and grilles, according to the Swedish Theft Prevention Association (SSF).
Security & Accessibility
In addition to resistance class 4, the grid system also creates attachment points and the ability to mount brackets for shelves, workbenches, etc. More and more organizations fall within the legal requirements for physical security. Therefore, we are constantly working to improve the product and make it more adaptable to different types of operations.
Electricians
Many electricians appreciate Ferrapod because it simplifies wiring.
Own ideas
Do you have your own ideas on accessories or customizations? Contact us and we will make them a reality.

Designing to Assembly
How we work together with the customer to develop a sustainable and long-term solution. The delivery time on a project without deviations is about 6-8 weeks from the approved footprint.
Datum
Site Visits & Planning
We make a site visit in order to get an idea and create a picture of how the perimeter protection should be adapted in consultation with the customer. We also measure and determine which parts of the existing infrastructure should be integrated or enclosed.

Datum
CAD - Computer Aided Design
We develop a CAD model and provide proofs of the design and footprint. Each component in the system has a specific code that can be identified on a 3D drawing. The installation team is equipped with an iPad containing a time-limited drawing; once the installation is complete, the drawing is removed to ensure control over information dissemination.

Datum
Planning & Assembly
All installations of FerraPod are carried out in accordance with the customer's wishes and requirements specification. Together, we agree on the times and conditions under which the assembly team will work to minimize the impact on regular operations.

Datum
Inspection & Handover
Before handing over, the cage is inspected according to protocol and then handed over with installation certificate, certification and final invoice. We never hand over a project everyone is 100% satisfied.

Briefly about us
The watchword for our business is security, security of the highest degree. The idea for FerraPod was born in a collaboration between customer and supplier: Stack EMEA (data center), which has the highest security focus, was looking for a supplier that could guarantee a product in Swedish Protection Class 3 without hot work to avoid operational disruptions.
